CURRENT

Description Large Remote Community/Industrial Operation
Existing System
1 MW (3 x 600 KVA Gensets)
Average/Peak Load
600 kW/1 MW
Daily Energy Demand
14,400 kWh/day
Annual Fuel Usage
1,201,371 L
Fuel Cost per Litre
$2.20
Annual Fuel Costs
$2,643,016
Servicing Costs per kWh
$0.025
kWh per Annum
$5,256,000
Annual Servicing Costs
$131,400
Total Costs per Annum
$2,774,417

SOLUTION

Description 800 kW PV System + 2.5 MWh BESS
PV System Cost
$800,000
BESS System Cost
$1,375,000
Inverter & Controls
$500,000
Installation & Commissioning
$625,000
Total System Cost
$3,300,000

RESULTS

Payback Period 1.19 Years
ROI
84.07%
Lifetime Savings (15 Years)
$38,316,250